The function of the automobile meter is to get the data needed and display it in a suitable way
A, to pay attention to the electrical conductivity of spreader, and the sling xu shoulds not be too thick, too thick can adopt the method of centralized burning when clear the coating on the appliance.
Two, because the artifacts, be sure to design good hanging fixture, request to hang with a strong and reliable.
Three, using cold wind blow dry, in the process of dry, examine artifacts, for allowing defects, such as flow, foaming, grinning, hole and usable acetone diluted powder coatings, such as the association TuCheng while artifacts not drying or spray coated the surface defects.
Four, use of waste heat curing processing for major defects need to repair, according to the different processing methods of coating thickness selection, generally have a direct on the powder spraying, mechanical grinding, deal with three methods with remover. Finally, with preliminary drying processing, the purpose are:
1. Is to remove the workpiece on the rest of the water.
2. Is can guarantee a certain thickness of powder coatings is better adhesion on the surface of workpiece.
(3) is to ensure that the workpiece evenly heat as soon as possible, to accelerate the curing process of general preliminary drying temperature is 90-140 ℃.